Flood Recovery - Lockyer: Hagan

Website/Report

(not documented)

Project lead

Partnerships

Natural Disaster Relief and Recovery Arrangements (NDRRA)

Landholder

Industries

(not documented)

Activities

On-ground work

Case study type

(none)

Funding source

Natural Disaster Relief and Recovery Arrangements (NDRRA)

Landholder

Funding amount

(not documented)

In-kind contribution

(not documented)

Start date

1 November 2013

End date

30 May 2014

Summary

The broader project will assist flood affected landholders identified through SEQC, Council and regional industry groups to return to production and improve the natural resilience of the waterways.

This project will:
  • stabilise approximately 400m of creek bank in the Upper Tenthill Creek catchment through bank battering (recently completed)
  • re-vegetate approximately 200m of creek bank with native trees, shrubs and grasses after topdressing with material obtained from enlarging and repairing a farm dam
  • help protect essential farm infrastructure
  • help continue agricultural production by improving bank stability in future moderate floods to improve water quality in upper Tenthill Creek by repairing bank erosion and re-vegetating creek bank
  • carry out 400m of creek bank engineering (bank battering)
  • establish 200m of riparian re-vegetation.

Benefits

(not documented)

Lesson

(not documented)

Reference ID

SEQC2094

Last updated: 16 May 2015

This page should be cited as:

Department of Environment, Science and Innovation, Queensland (2015) Flood Recovery - Lockyer: Hagan, WetlandInfo website, accessed 20 December 2024. Available at: https://wetlandinfo.des.qld.gov.au/wetlands/resources/tools/wetland-project/flood-recovery-lockyer-hagan-2c8f/

Queensland Government
WetlandInfo   —   Department of the Environment, Tourism, Science and Innovation