Skip links and keyboard navigation

Flood Recovery - Lockyer: Darvall

Website/Report

(not documented)

Project lead

Partnerships

Natural Disaster Relief and Recovery Arrangements (NDRRA)

Landholder

Industries

(not documented)

Activities

On-ground work

Case study type

(none)

Funding source

Natural Disaster Relief and Recovery Arrangements (NDRRA)

Landholder

Funding amount

(not documented)

In-kind contribution

(not documented)

Start date

1 August 2013

End date

30 April 2014

Summary

The broader project will assist flood affected landholders identified through SEQC, Council and Regional industry groups to return to production and improve the natural resilience of the waterways.

This project will be conducted by the landholder and will:
  • realign a creek crossing on a designated fire control line in the Mt Campbell area (Rockmount)
  • address approach and departure angles to allow fire vehicles passage and afford improved fire management for biodiversity and grazing outcomes
  • improve biodiversity in the Lockyer catchment by enabling improved fire management
  • reinstate production on viable grazing property
  • reinstate a creek crossing and access track.

Benefits

(not documented)

Lesson

(not documented)

Reference ID

SEQC2068

Last updated: 16 May 2015

This page should be cited as:

Department of Environment, Science and Innovation, Queensland (2015) Flood Recovery - Lockyer: Darvall, WetlandInfo website, accessed 20 December 2024. Available at: https://wetlandinfo.des.qld.gov.au/wetlands/resources/tools/wetland-project/flood-recovery-lockyer-darvall-2e71/

Queensland Government
WetlandInfo   —   Department of the Environment, Tourism, Science and Innovation